EXPONENT NRG Request an On-Site Energy Assessment
Home / Explore your energy requirement.

EXPONENT NRG

Explore your energy requirement.

Use your own operating data for an initial scenario. These tools support an assessment; they do not replace site measurements, engineering or a quotation.

FROM REQUIREMENT TO DELIVERY

  1. Define the business challenge
  2. Compare relevant solutions
  3. Review the technical case
  4. Assess the site and economics
  5. Discuss project delivery

ENGINEERING SCREENING

Explore a first-pass project estimate

Enter site data and your own commercial assumptions. Outputs update as inputs become valid; use Calculate Estimate for a deliberate refresh.

All calculations are indicative baseline estimates subject to detailed on-site power quality logging and engineering validation.

Industrial solar feasibility

Screen rooftop capacity, annual self-consumption value and indicative installed cost. No export value is assumed.

Site and demand

The area screen caps system capacity. Self-consumption is also capped by annual site energy inferred from bill ÷ tariff.

User-supplied commercial assumptions

Enter local quotations and tariff assumptions. The optional lifecycle screen needs both a period and a discount rate.

Complete the required assumptions to see a screening estimate.

BESS sizing + diesel displacement

Estimate battery energy, generator fuel displaced, recharge cost and operational emissions for the stated events.

Critical duty and battery design

Battery nameplate sizing includes the entered load factor, efficiency, usable depth of discharge and capacity reserve.

Diesel, energy and emissions assumptions

Emissions are operational estimates from the factors you enter; lifecycle, upstream and embodied emissions are excluded.

User-supplied installed cost and O&M

Use project-specific quotations. PCS sizing uses the entered critical peak kW as the screening power basis.

Complete the required assumptions to see a screening estimate.

These screens do not include financing, tax, battery or inverter replacements, degradation over time, export revenue, or a bankable forecast. Operational savings and emissions are estimates based only on the assumptions entered. Simple payback is first-year net operating savings against installed cost, held level; it is distinct from a full cash-flow model such as SAM discounted payback (see SAM financial models). Lifecycle value is shown only when period and discount assumptions are supplied; no LCOE is calculated.

Choose a tool

EV Charging Assessment

Explore assumptions, calculate an indicative result and include it in your assessment enquiry.

Energy Solution Finder

Explore assumptions, calculate an indicative result and include it in your assessment enquiry.

YOUR NEXT STEP

Turn this requirement into a project brief.

Share your site, operating priorities and available data. Start with an assessment, arrange a survey where needed, then discuss the project scope.