EXPONENT NRG Request an On-Site Energy Assessment
Home / Tools / Battery Backup Calculator

EXPONENT NRG

Battery Backup Calculator

Replace the illustrative starting values with your site data. Review the assumptions before using a result.

FROM REQUIREMENT TO DELIVERY

  1. Define the business challenge
  2. Compare relevant solutions
  3. Review the technical case
  4. Assess the site and economics
  5. Discuss project delivery

Your operating scenario

Battery Backup Calculator

Enter your operating data to explore a preliminary scenario.
Assumptions and calculation method

AC energy = critical kW × hours. Battery nameplate = AC energy ÷ discharge efficiency ÷ usable depth of discharge ÷ retained capacity. Power allowance is a screening input, not a motor-starting or PCS rating guarantee. No solar or generator contribution is assumed. Transfer time, C-rate, reserve and thermal design require engineering.

Illustrative starting values. Replace them with your site data before discussing a project.

Continue with a relevant solution

Energy Storage / BESS

Start with critical load, outage duration and operating consequences. Select the architecture and battery technology against that duty cycle.

Industrial Backup Power

Separate essential processes from deferrable demand, then coordinate storage, generators and controls to meet the required continuity level.

YOUR NEXT STEP

Turn this requirement into a project brief.

Share your site, operating priorities and available data. Start with an assessment, arrange a survey where needed, then discuss the project scope.

ENGINEERING SCREENING

Explore a first-pass project estimate

Enter site data and your own commercial assumptions. Outputs update as inputs become valid; use Calculate Estimate for a deliberate refresh.

All calculations are indicative baseline estimates subject to detailed on-site power quality logging and engineering validation.

BESS sizing + diesel displacement

Estimate battery energy, generator fuel displaced, recharge cost and operational emissions for the stated events.

Critical duty and battery design

Battery nameplate sizing includes the entered load factor, efficiency, usable depth of discharge and capacity reserve.

Diesel, energy and emissions assumptions

Emissions are operational estimates from the factors you enter; lifecycle, upstream and embodied emissions are excluded.

User-supplied installed cost and O&M

Use project-specific quotations. PCS sizing uses the entered critical peak kW as the screening power basis.

Complete the required assumptions to see a screening estimate.

These screens do not include financing, tax, battery or inverter replacements, degradation over time, export revenue, or a bankable forecast. Operational savings and emissions are estimates based only on the assumptions entered. Simple payback is first-year net operating savings against installed cost, held level; it is distinct from a full cash-flow model such as SAM discounted payback (see SAM financial models). Lifecycle value is shown only when period and discount assumptions are supplied; no LCOE is calculated.