Evaluate rooftops or land against daytime demand, structural conditions and the connection strategy before committing to capacity.
EXPONENT NRG
Solar value starts with demand timing
Why annual generation is only part of the opportunity.
FROM REQUIREMENT TO DELIVERY
- Define the business challenge
- Compare relevant solutions
- Review the technical case
- Assess the site and economics
- Discuss project delivery
Engineering guide
Solar generation and facility demand vary during the day. Self-consumed solar is the portion that serves demand at the time it is generated.
An annual energy comparison cannot establish self-consumption. Use interval demand and an hourly solar model, including holidays, shutdowns and seasonal conditions.
For a Bangladesh project, confirm current utility connection and net-metering requirements with the relevant authority before counting on export income. The screening calculator excludes export revenue.
Apply the guide
Model solar output, site demand and battery operation together. Storage adds value when there is a defined energy-shifting or backup requirement.